3D engineering lab
Eleven plant machines you can take apart, quiz yourself on, put back together and compare, all free in your browser on desktop or phone.
1How the lab works
Rotate, explode and cut the machine. Tap any part for what it is, why it is there, when to check it, where it sits, who looks after it and how it works.
Change the yellow design inputs and watch the model and every number update: sizes, losses, efficiency, cost.
The lab names a part; you tap it on the 3D model. Only first-try answers without a hint count toward your score.
The machine is taken apart into a tray. Pick each part and tap where it goes until the machine is complete.
See the machines of each field side by side: what they do, how they are sized, protected and maintained.
Switch modes with the Lab buttons above the model: Explore, Find the part, Assemble.
2Machines
Electrical machines and switchgear
Utility and mechanical equipment
Textile machinery
3Compare
Typical figures for orientation; confirm ratings with the equipment maker and the applicable standard.
Electrical machines and switchgear
| Machine | What it does | Key sizing number | Typical efficiency | Main protection | Key standards | First check in maintenance |
|---|---|---|---|---|---|---|
| 3-phase Induction Motor | Electrical to mechanical power | kW, poles, full-load current | IE2–IE4 classes, about 85–96 % by size | Overload relay / MPCB, short-circuit protection | IS 12615, IEC 60034-30-1 | Insulation resistance, bearing vibration |
| Oil-immersed Distribution Transformer | Changes voltage level (11 kV to 433 V) | kVA, impedance % | About 98–99 % near full load | Buchholz, OTI/WTI, HV breaker or fuse | IS 1180, IS 2026 | Oil BDV and dissolved gas analysis |
| Diesel Generator (DG) Set | Diesel to electricity for backup | kVA at 0.8 pf, motor-start dip | About 30–40 % fuel to electricity | Low oil pressure, high temperature, overspeed, overcurrent | ISO 8528, CPCB IV+ | Battery, fuel, coolant, weekly load run |
| 11 kV Vacuum Circuit Breaker (VCB) Panel | Switches and interrupts HT current | Breaking kA, rated current | Very small losses (contacts and busbars) | IDMT overcurrent and earth-fault relays | IEC 62271-100 / -200 | Relay secondary injection, contact wear |
Utility and mechanical equipment
| Machine | What it does | Key sizing number | Typical efficiency | Main protection | Key standards | First check in maintenance |
|---|---|---|---|---|---|---|
| End-suction Centrifugal Pump Set | Moves liquid against head | Flow and head, NPSH | About 60–85 % pump efficiency | Dry-run and overload trips, NRV | ISO 2858 / EN 733, ISO 9906 test | Vibration, seal leak, operating point |
| Rotary Screw Air Compressor Package | Makes compressed air | FAD and pressure, kW per m³/min | Judged by specific power | High discharge temperature, overload | ISO 1217 performance | Leaks, filters, discharge temperature |
| Packaged 3-pass Fire-tube Steam Boiler | Makes steam from fuel | Steam t/h and pressure | About 70–85 % (fuel dependent) | Low-water cut-outs, safety valves | IBR 1950 | Water level controls, TDS, flue O₂ |
| Induced-draft Counterflow Cooling Tower | Rejects heat to air by evaporation | Flow, range, approach | Effectiveness about 60–75 % | Vibration switch on fan | CTI ATC-105 testing | Fill, nozzles, water treatment |
| Shell-and-tube Heat Exchanger | Transfers heat between two fluids | Duty kW, area, U | Judged by approach and fouling | Relief valve, temperature alarms | TEMA, ASME VIII / IS 2825 | Outlet temperatures (fouling trend) |
Textile machinery
| Machine | What it does | Key sizing number | Typical efficiency | Main protection | Key standards | First check in maintenance |
|---|---|---|---|---|---|---|
| Air-jet Weaving Loom | Weaves fabric with an air-blown weft | RPM, reed width, PPI | Loom efficiency about 80–90 % | Warp and weft stop motions | Maker settings per fabric | Warp breaks, nozzles, air leaks |
| Ring Spinning Frame | Drafts and twists roving into yarn | Spindle speed, count, TM | Efficiency about 90–96 % | Pneumafil, overload trips | Maker settings per count | Ends down, travellers, cots and aprons |
More machines are being added suite by suite.